UNCRATING AND SET-UP
Remove your Series 2000 changer from the shipping box. Open
the door. (The T-handle is a screw-in type and therefor, must be
turned at least 10 times counter-clockwise until it opens.)
Inspect for any connectors or components that may have been
dislodged during shipping. The lock and keys for your changer
will be inside the manila envelope along with this manual. To
install the lock, insert the cylinder into the round hole in the
middle of the T-handle and push until it stops. Now turn the key
and lock until you hear it “snap." Turn the key counter-
clockwise ¼ turn and remove the keys.
NOTE: THE METER ON THE MAIN LOGIC BOARD
CANNOT BE RESET TO ZERO!!!
TEST:
Before permanently installing the changer, do a functional test to
verify that there is no shipping damage to your new changer(s).
Extend the power cord through the hole in the back of the
changer or the bottom and plug it into a grounded 120vac outlet.
The dip switches are already set for a 4 coin per dollar pay-
out of the hoppers, and the Bill validator is ready to accept
$1-$5-$10-$20 dollar bills.
Fill the each hopper with at least 100 coins. On the main logic
board turn the switch on the bottom right corner “ON". (SEE
FIG. 1 ON PG.3) The rocker switch has a “1” and “0” printed
on it. When the “1” is pressed down the changer is “ON”.
MOUNTING THE AC2001 TO A WALL
IF YOU ARE UNSURE IN ANY WAY IN PROCEEDING
WITH THE FOLLOWING STEPS, PLEASE HIRE A LOCAL
PROFESSIONAL ELECTRICIAN TO MOUNT YOUR
CHANGER FOR YOU!
1. Disconnect any and all AC power going to the series 2001
changer. (See fig. 1)
A. Unplug the AC line cord from the bottom of the board.
B. Unplug the validator connectors on the right side of the
board.
C. Unplug the hoppers harness connectors on the left side
of the board.
D. Unbolt the ground wire from the right side of the
cabinet.
E. Remove the main logic board and hoppers from the
inside of the changer.
F. Put the nuts back on the studs to avoid losing the brass
spacers on the studs.
2. Slide the hoppers out of the cabinet.
3. Note: You will need to verify with the building code that it
is allowable to plug the changer into a 3 prong grounded
outlet. If it is not, there must be 120VAC run through
conduit to the changer. If it is not required, proceed to step
#6.
4. Let the electrician run the conduit, install the new breaker,
wire and help decide how the wiring will enter the changer
(from the back or the bottom). This will affect the
mounting location.
5. After the conduit has been installed, proceed with the
mounting.
6. Locate the 4 punch-outs on the back wall of the changer.
Using a screwdriver and hammer knock the punch-outs
out by hitting them from the inside of the changer.
7. Using a stud locator, find a location to hang the changer
by locating the wall studs.
8. Find an appropriate wall to bolt the changer into. The
wall should have studs or be constructed of concrete.
Consult a professional with any questions you may
have.
9. NOTE: HANGING THE CHANGER FROM LESS
THAN ALL 4 HOLES MAY BE DANGEROUS.
EACH HOLE NEEDS A BOLT THROUGH EACH
ONE MOUNTED SECURELY TO THE WALL.
MOUNTING THE CHANGER IN ANY OTHER WAY
MAY RESULT IN THE CHANGER BEING TORN
OFF OR FALLING OFF THE WALL RESULTING
IN PERSONAL OR CUSTOMER INJURY ALONG
WITH ELECTRICAL SHOCK.
10. Choose a height to mount the changer keeping in mind
that a handicapped person in a wheelchair should still be
able to insert a bill into the bill validator. (We
recommend no higher than 4 feet above the ground.)
11. Have someone hold the changer against the wall while
someone else marks the holes. CAUTION: THE
CHANGER WEIGHS 85 POUNDS DO NOT EXERT
YOURSELF SO THAT YOU MAY CAUSE AN
INJURY.
12. BEFORE DRILLING THE FOUR MARKED HOLES
ENSURE THAT THERE ARE NO ELECTRICAL
WIRES, TELEPHONE LINES, GAS, OR WATER
LINES BEHIND THE WALL WHICH DISRUPTING
MAY CAUSE A LOSS OF LIFE OR PERSONAL
INJURY!
13. Hold the changer back up to the wall. Thread and
tighten bolts.
14. Verify that the machine is securely mounted.
15. Reinstall the main logic board.
A. Before installing the main logic board, verify that
the plastic safety-insulating sheet is still against the
back wall where the board will be mounted and
that there is a 3/8” spacer on each stud.
B. Install the main logic board and properly tighten
the nuts.
C. Re-bolt the ground wire into the right side of the
cabinet.
D. Plug the validator connector into the right side of
the board.
E. Plug the hoppers harness connectors into the left
side of the board
16. If the changer is permanently connected through a
conduit, proceed to step #18.
17. Feed the AC line cord out the bottom or the back of the
changer then perform the following.
A. Connect the AC line cord into the bottom of the
main logic board.
B. Plug the male end into the AC wall outlet. Do not
use an extension cord unless allowed by the
building electrical code.
C. Important: Attach the line cord clamp to the line
cord. Verify it is at the right length and that the line
NOTE: The only way to get a duplicate set of keys
made is to save the red tag that comes between the